Contact us

Gold Standard and other Stakeholder Consultations

All our projects are aimed at having an impact beyond the mitigation of global warming. Stakeholder consultations ensure involvement of the local communities in the early stage of every emission reduction project.

Find below South Pole's projects currently undergoing the stakeholder consultation process:

2023

GS7142 - Conserving the Mulanje Mountains, Malawi - Saving forests and empowering mountain communities with improved cookstoves (Uploaded 18/09/2023)

GS5051 GS2404 International Water Purification Programme - Chlorine Dispensers in Uganda - CPA 9 (uploaded 2023/04/10)

GS5052 GS2404 International Water Purification Programme - Chlorine Dispensers in Uganda - CPA 10 (uploaded 2023/04/10)

GS5051 GS2404 International Water Purification Programme - Chlorine Dispensers in Uganda - CPA 9 (uploaded 2023/04/10)

2022

Xe Namnoy 2 - Xe Katam 1 Hydropower project (GS2510) (uploaded 2022/10/31)

Xenamnoy-6 Hydropower Project (GS2490) (uploaded 2022/11/18)

Fuel-efficient cookstoves for cocoa producing communities (GS11565) (uploaded 2022/07/01)

Suzhou Qizi Mountain Landfill Gas Recovery Project (GS397) (uploaded 2022/03/08)

WWF Mamize Firewood-Saving Cook Stove Project IV(GS1096) (uploaded 2022/03/08)

WWF Mamize Firewood-Saving Cook Stove Project III (GS1095) (uploaded 2022/03/08)

WWF Mamize Firewood-Saving Cook Stove Project II (GS1097) (uploaded 2022/03/08)

WWF Mamize Firewood-Saving Cook Stove Project I (GS1094) (uploaded 2022/03/08)

Biolite Solar Lighting Project, Rwanda (GS11398) (uploaded 2022/03/04)

Biolite Solar Lighting Project, Malawi (GS11397) (uploaded 2022/03/04)

GS2404 International Water Purification Programme - CPA 3 Chlorine Dispensers in Uganda (GS3668) (uploaded 2022/02/10)

GS2404 International Water Purification Programme - CPA 2 Chlorine Dispensers in Uganda (GS2735) (uploaded 2022/01/07)

2021

JOil Jatropha plantation in Ghana (uploaded 2021/03/12)

Xenamnoy 1 Hydropower project (GS2766) (uploaded 2021/02/20)

2020

InfraVest Taiwan Wind Farms Bundled Project 2011 in Taiwan (GS1001) (uploaded 2020/09/23)

Nazava Water Filter Project in Ethiopia (GS10824) (uploaded 2020/09/17)

Himalayan Rocket Stove Project in India (GS10797) (uploaded 2020/08/31)

Lake Naivasha Basin Reforestation Project (GS6504) (uploaded 2020/02/19)

Household and Commercial Biogas Plants in Kenya (GS7587) (uploaded 2020/02/07)

WWF Mamize Firewood-Saving Cook Stove Project I (GS1094) (uploaded 2020/01/17)

WWF Mamize Firewood-Saving Cook Stove Project II (GS1097) (uploaded 2020/01/17)

WWF Mamize Firewood-Saving Cook Stove Project III (GS1095) (uploaded 2020/01/17)

WWF Mamize Firewood-Saving Cook Stove Project IV (GS1096) (uploaded 2020/01/17)

2019

Yingxin WHR Project (GS750, PMT ID300502) (uploaded 2019/10/16)

Badamsha Wind Farm in Kazakhstan (uploaded 2019/07/25)

Key Project Information is provided below. Comments are welcome. Please also provide your responses to the corresponding questions from the Questionnaire

I want to provide a comment

Tataouine Solar Photovoltaic Plant in Tunisia (uploaded 2019/07/25)

Key Project Information is provided below. Comments are welcome. Please also provide your responses to the corresponding questions from the Questionnaire

I want to provide a comment

GS7438 Improved Cookstove Project In Uganda (uploaded 2019/06/19)

Conserving the Mulanje Mountains, Malawi - Saving forests and empowering mountain communities with improved cookstoves (GS7142) (uploaded 2019/02/21)

Stakeholders are invited for the Stakeholder Feedback Round

I want to provide a comment

2018

Household Biogas plants installed in rural areas of Uttar Pradesh & Maharashtra - GS4GG (uploaded 2018/10/26)

Stakeholder are invited for the Stakeholder Feedback Round

I want to provide a comment

Efficient And Clean Cooking For Mozambican Low Income Households (GoldStandard ID: 5562) (uploaded 2018/05/11)

Conserving the Mulanje Mountains, Malawi - Saving forests and empowering mountain communities with improved cookstoves (uploaded 2018/04/12)

Key Project Information is provided below. Comments are welcome. Please also provide your responses to the corresponding questions from the Questionnaire and the Input & Grievance Mechanism

I want to provide a comment

WWF Meigu Panda Habitat Conservation Clean Cookstove Project (GoldStandard ID: 5842) (uploaded 2018/02/06)

Nam Hinboun Downstream Hydropower Project (GoldStandard ID: 6018) (uploaded 2018/02/06)

2017

Zhongshan County Micro Hydro Project Bundle No.1 (GoldStandard ID: 1098) (uploaded 2017/12/28)

Zhongshan County Micro Hydro Project Bundle No.2 (GoldStandard ID: 1100) (uploaded 2017/12/28)

Zhongshan County Micro Hydro Project Bundle No.3 (GoldStandard ID: 1101) (uploaded 2017/12/28)

Zhongshan County Micro Hydro Project Bundle No.5 (GoldStandard ID: 1103) (uploaded 2017/12/28)

Zhongshan County Micro Hydro Project Bundle No.6 (GoldStandard ID: 1104) (uploaded 2017/12/28)

Papop Biogas and Renewable Energy Project in Thailand (ID: 300874) (uploaded 2017/09/01)

Bokpoort Concentrating Solar Power Project (ID: 302046) (uploaded 2017/08/22)

Nam Kap Hydropower Project (ID: 301892) (uploaded 2017/08/14)

Biogas PoA in Switzerland (uploaded 2017/06/16)

Stakeholders are invited for the Stakeholder Feedback Round.

I want to provide a comment

Flamingo Cookstove Project (ID: 2504) (uploaded 2017/04/20)

InfraVest Guanyin Wind Farm Project (uploaded 2017/04/07)

Dora II 9.5 MWe Geothermal Energy Project (Gold Standard 445)

The project is applying for the renewal of the crediting period. Comments are invited from relevant stakeholders, and the consultation period is from 8th of December 2017 to 7th of February 2018.

I want to provide a comment

2016

Bamako Clean Cookstoves - Improving livelihoods and fighting desertification in the Sahel zone (Gold Standard ID: 5003) (uploaded 2016/11/04)

Guangzhou Zhujiang Beer Methane Recovery Project (uploaded 2016/08/08)

Prony and Kafeate wind-farms, New Caledonia

(Gold Standard 566)

Stakeholders are invited to the Stakeholder feedback round from 29th February 2016 to 28th March 2016:

I want to provide a comment

Tulip Filters in Tanzania VPA 1 (Gold Standard ID: 3267) (uploaded 2016/01/29)

2015

Suzhou Qizi Mountain Landfill Gas Recovery Project (Gold Standard ID: 397) (uploaded 2015/10/05)

The project is applying for the renewal of the crediting period. Comments are invited from relevant stakeholders electronically for an online stakeholder consultation.

I want to provide a comment

Nam Nga 2 Hydropower Project (Gold Standard ID: 3372) (uploaded 2015/07/30)

Nam Sor Hydropower Project (GoldStandard ID: 4207) (uploaded 2015/07/30)

Nam Ngao Hydropower Project (GoldStandard ID: 4208) (uploaded 2015/07/30)

4.5 MW Biomass (low density Crop Residues) based Power Generation unit of Malavalli Power Plant Pvt Ltd (Gold Standard ID: 343) (uploaded 2015/05/13)

Stakeholders are invited for the Stakeholder Feedback Round.

I want to provide a comment

Nam Pha Gnai Hydropower Project (Gold Standard ID: 3514) (uploaded 2015/04/20)

Stakeholders are invited for the Stakeholder Feedback Round.

I want to provide a comment

Dispensers in Uganda - CPA 3 (Gold Standard ID: 3668) (uploaded 2015/04/13)

2014

InfraVest Changbin and Taichung bundled Wind Farms project, Taiwan (Gold Standard ID: 472) (uploaded 2014/12/01)

The first crediting period of the project will be ended on 13th of January 2015, and now the project is applying for the renewal of the crediting period. Comments are invited from relevant stakeholders electronically for an online stakeholder consultation, and the consultation period will last until the end of December 2014.

Stakeholders are invited to provide their comments:

I want to provide a comment

Vinh Son 5 Hydropower Project (Gold Standard ID: 3012) (uploaded 2014/09/09)

Chi Khe Hydropower Project (Gold Standard ID: 3013) (uploaded 2014/09/09)

Song Chung Hydropower Project (Gold Standard ID: 3014) (uploaded 2014/08/28)

Nam Ngan Hydropower Project (Gold Standard ID: 3016) (uploaded 2014/08/11)

Za Hung Hydropower Project, Vietnam (Gold Standard ID: 3015) (uploaded 2014/07/23)

International Water Purification PoA_Chlorine Dispensers in Uganda CPA2 (Gold Standard ID: 2735) (uploaded 2014/06/03)

The Local Stakeholder Consultations held on 7th November 2013 have been concluded. Project documents are provided below. Comments are welcome.

I want to provide a comment

The Xenamnoy-6 Hydropower project (Gold Standard ID: 2490) (uploaded 2014/03/11)

The Local Stakeholder Consultations held on 15th August 2013 and 17th August 2013 have been concluded. Project documents are provided below. Comments are welcome.

I want to provide a comment

Nam Samoy Hydropower Project (Gold Standard ID: 2695) (uploaded 2014/05/28)

The Local Stakeholder Consultations held on 6th December 2013 and 8th December 2013 have been concluded. Project documents are provided below. Comments are welcome.

I want to provide a comment

ER Project 301602 Reforestation on degraded lands in Colombia (uploaded 2014/05/15)

Xenamnoy 1 Hydropower Project (Gold Standard ID: 2766) (uploaded 2014/05/12)

Poultry Litter Based Power Project in Ranga Reddy District, Andhra Pradesh (Gold Standard ID: 3072) (uploaded 2014/04/25)

Nam Mo 3 Hydro Power Project, Vietnam (Gold Standard ID: 2673) (uploaded 2014/04/25)

Avoided methane emission through aerobic composting at Vietstar municipal solid waste treatment facility (Gold Standard ID: 2525) (2014/04/23)

Ta Trach Hydropower PoA-CPA (Gold Standard ID: 2715) (uploaded 2014/03/28)

Song Mien 5A Hydropower PoA-CPA (Gold Standard ID: 2714) (uploaded 2014/03/26)

Nam Chim 1A Hydropower PoA-CPA (Gold Standard ID: 2713) (uploaded 2014/03/26)

Krong No 3 PoA-CPA (Gold Standard ID: 2712) (uploaded 2014/03/20)

Krong No 2 PoA-CPA (Gold Standard ID: 2711) (uploaded 2014/03/20)

Xenamnoy 2-Xekatam 1 Hydropower project (Gold Standard ID: 2510) (uploaded 2014/02/17)

Stakeholders are invited for the Stakeholder Feedback Round.

I want to provide a comment

Houay Lai Hydropower project (Gold Standard ID: 2511) (uploaded 2014/02/17)

Ea Sup 3 Hydropower project (Gold Standard ID: 2539) (uploaded 2014/02/10)

2013

Super Cerdo Paisa AR (uploaded 2013/10/20)

Stakeholders are invited for the Stakeholder Feedback Round.

I want to provide a comment

International Water Purification PoA (Gold Standard ID: 2404) (uploaded 2013/10/20)

WWF Ningshan County High Efficient Cook Stove Project Gold Standard 2429) (uploaded 2013/10/08)

Song Bung 5 Hydropower in Viet Nam (Gold Standard 1355) (uploaded 2013/09/24)

Song Bung 6 Hydropower in Viet Nam (Gold Standard 1345) (uploaded 2013/09/24)

Nam Pong Hydropower in Viet Nam (Gold Standard 1362) (uploaded 2013/09/24)

Dak Pone Hydropower in Viet Nam (Gold Standard 1347) (uploaded 2013/09/24)

Reforestation with Rubber on degraded lands of Colombia (uploaded 2013/05/27)

The Local Stakeholder Consultation was held on 9th March 2012.

I want to provide a comment

Reserva Natural El Silencio: Restoration of degraded lands with agroforestry systems in Colombia (uploaded 2013/05/27)

The Local Stakeholder Consultation was held on 30th April 2013.

I want to provide a comment

InfraVest Taiwan Wind Farms Bundled Project 2011 (uploaded 2013/03/29)

(Gold Standard 1001)
The Local Stakeholder Consultation was held on 3rd January 2011 and has been concluded. The Stakeholder Feedback Round has started on 29th March 2013 and will last until 29th May 2013. Project documents are provided below. Comments are welcome.

I want to provide a comment

Three GS VER micro-scale cookstove projects (uploaded 2013/02/05)

(Gold Standard 1095, 1096 & 1097)

Three new GS micro-scale projects (GS 1095, GS 1096 & GS1097), the WWF Cook Stove Projects in the Mamize Nature Reserve of Sichuan province in P.R. China, are collecting public feedback comments now. You can download the Local Stakeholder Consultation Report, PDD and GS Passport of the three projects below. For any comments or suggestions to the projects, please contact us.

1095

1096

1097

I want to provide a comment

2012

7.5 MW Poultry Litter Project by Redan Infrastructure Private limited, India (uploaded 2012/09/04)

IFM Integrated Clean Energy Project, South Africa (uploaded 2012/06/21)

2011

Ferrosilicon waste heat power generation project (Gold Standard 1041) (uploaded 2011/06/20)

Eiamrungruang WWT and Biogas Utilization Project, Thailand

(Gold Standard 1063)

The Initial Stakeholder Consultation has been concluded.
The stakeholder feedback round will be held on 11 August 2011. The stakeholders will be invited to comment on the project for two months.

I want to provide a comment

Kariba REDD+ Project, Zimbabwe

Key stakeholders have been identified and invited to the Local Stakeholder Consultation, which will take place on the 22nd of September 2011.

I want to provide a comment

2010

Tough Stuff Solar Panel and Lamp Sales, Madagascar

Stakeholders are invited to the Local Stakeholder Consultation that will take place on the 15th of December 2010 at 09.00 at Motel Anosy, Antanarivo.

I want to provide a comment

Clean Energy One Biomass Power Plant Project (Gold Standard 792)

Stakeholders have been identified and invited to the Main Stakeholder Consultation which will start on the 8th of November 2010.

I want to provide a comment

Restoration of degraded areas and reforestation in Cáceres and Cravo Norte, Colombia

Stakeholder Consultation has started on 4th of October.

I want to provide a comment

Biogas utilization project in Zhejiang Jingxing Paper Joint Stock Co. Ltd.

A second round of Stakeholder Consultation has started. A public meeting will be held on the 15th of June 2010.

I want to provide a comment

2009

Sustainable Small Hydropower Programme of Activities (PoA), Vietnam

Stakeholders are invited to the Local Stakeholder Consultation that will take place on the 24th of December 2009 at Bao Son Hotel, 50 Nguyen Chi Thanh, Hanoi, Viet Nam, from 8:30 to 11:30.

I want to provide a comment

Hebei Yingxin Glass Group Co. Ltd. Glass Furnace Flue Gas Waste Heat To Energy Project, China

Stakeholders are invited to the Second Round Stakeholder Consultation that will take place on the 15th of December 2009.

I want to provide a comment

3.66MW poultry litter based power generation project by Raus Power, India

(Gold Standard 400)

Stakeholders have been identified and invited to the Main Stakeholder Consultation which will start on the 4th of May 2009 and will last until the 4th of July 2009.

I want to provide a comment

Capture and use of biogas in Venezuelan swine farms of Grupo la Caridad C.A

Stakeholders have been identified and invited to the Local Stakeholder Consultation which took place March, 6th 2009 .

I want to provide a comment

Antai Group Waste Gas Recovery for Power Generation Project

(Gold Standard 605)
The Stakeholder Feedback Round has started on the 25th of April 2009. The commenting period is open until the 30st of June 2009.

I want to provide a comment

Yanshuihe 1st Stage Hydro Power Station, China

(Gold Standard 667)
Key stakeholders have been identified and invited to the Local Stakeholder Consultation, which will take place on the 5th of March 2009.

Stakeholders are invited to provide their comments:
I want to provide a comment

Wanzhou Kehua Cement WHR to 13.5MW Electricity Project in Wanzhou District, China

(Gold Standard 475)

A second round of Stakeholder Consultation has started. A public meeting was held on the 17th of December 2008. The Main Stakeholder Consultation period started on the 1st of March 2009 and will last until 31st of May 2009.

Stakeholders are invited to provide their comments:
I want to provide a comment

InfraVest Changbin and Taichung bundled Wind Farms project, Taiwan

(Gold Standard 472)

The Main Stakeholder Consultation will start on the 3rd of December 2008 and will last until the 3rd of February 2009.

I want to provide a comment

InfraVest Guanyin & Hsinwu Wind Farm Project – Taiwan

(Gold Standard 612)

The Local Stakeholder Consultation has been concluded. The Stakeholder Feedback Round has started and will last until 14th of May 2009.
Project documentation is provided below. Comments are welcome:

I want to provide a comment

Beixu Group Methane to Energy Project

(Gold Standard 405)

A second round of Stakeholder Consultation has started. A public meeting will be held on the 23rd of February 2009. The Consultation period will last until 30th of April.

I want to provide a comment

2008

Wu'an Municipality Tongbao Coking Oven and CDQ Waste Heat Recovery Project, China

A second round of Stakeholder Consultation has started. A public meeting was held on the 20th of November 2008. The Consultation period will last until end of February.

I want to provide a comment

Guangzhou Zhujiang Beer Methane Recovery Project, China

(Gold Standard 401)A second round of Stakeholder Consultation has started. A public meeting was held on the 26th of December 2008.

I want to provide a comment

Methane Recovery Project in Leachate Treatment Process of Municipal Waste Incineration Power Plant Bundle

Key stakeholders have been identified and invited to the Local Stakeholder Consultation of Yixing, one project of the bundle. The meeting took place on December 25th, 2008.

Key stakeholders have been identified and invited to the Local Stakeholder Consultation of Jiangyin, one project of the bundle. The meeting takes place on April 16th, 2009.

Stakeholders are invited to provide their comments:
I want to provide a comment

Others

Blue Fire Bio wastewater treatment and biogas utilization project

Hebei Xinpu Cement Co. Ltd. Waste Heat to Energy Project

(Gold Standard 624)

The Local Stakeholder Consultation has been concluded.
Project documentation is provided below. Comments are welcome:

I want to provide a comment

Tarnthanawat WWT, Thailand

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.

I want to provide a comment

Saraff Biogas, Thailand

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.

I want to provide a comment

Chantaburi Starch WWT and biogas utilization, Thailand

(Gold Standard 521)
Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded. The Main Stakeholder Consultation has started and will last until May 15, 2009.

I want to provide a comment

Pitak Palm Wastewater Treatment and Biogas Utilization Project, Thailand

(Gold Standard 515)

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
The Main Stakeholder Consultation has started and will last until May 15, 2009.

I want to provide a comment

Sukhothai Bioenergy Project, Thailand

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.

I want to provide a comment

Available Languages