Melden Sie sich

Hongji and Yandun Wind

China
project_image_303798-1.jpg
Standort
China
Typ
Wind power
Registry
Standards
standard-logo-cdm-500x-cropped.jpg

Ziele für nachhaltige Entwicklung

7. Bezahlbare und saubere Energie

726,383 MWh

of clean energy produced by the project on average annually

8. Menschenwürdige Arbeit und Wirtschaftswachstum

Jobs created

during both the construction and operational phase of the project, promoting local economic development

13. Maßnahmen zum Klimaschutz

610,400 tonnes of CO2e

reduced on average annually thanks to the project

Die Lösung

Located in within Wulanchabu City in China’s Autonomous Region of Inner Mongolia, this project involves the construction and operation of 315 wind turbines that generate clean green energy for the North China Power Grid. By displacing fossil fuel-generated energy the project effectively reduces greenhouse gas emissions and contributes towards China’s transition to a low-carbon future.

project_image_303798-1.jpg
project_image_303798.jpeg
project_image_303798-1.jpeg
project_image_303798-1.jpg
project_image_303798.jpeg
project_image_303798-1.jpeg

Die Auswirkungen

In addition to environmental benefits, of emission reductions and weening the country's dependence on fossil fuels, the project boosts the local economy through job creation. As the wind turbines are manufactured in China, jobs are created at multiple stages, during manufacturing, installation, and the operation of the project - providing future-proof opportunities that is helping to drive China's transition to renewable energy sources. 

Project ID: 303798
Available Languages