Contáctenos

Musi River Hydro

Energía hidroeléctrica renovable para la isla de Sumatra

Indonesia
project_image_300358.jpg
Ubicación
Indonesia
Tipo de proyecto
Small hydropower
Registro
Estándares
vcs-standard-logo-with-title-south-pole.jpg

Objetivos de Desarrollo Sostenible

7. Energía asequible y no contaminante

765,000 MWh of clean energy

generated on average annually by the hydro plant, displacing fossil fuel-generated electricity and boosting Indonesia’s renewables sector

8. Trabajo decente y crecimiento económic

50 permanent jobs

created in power plant operations, with part-time employment opportunities offered during the construction phase

9. Industria, innovación e infraestructura

2 draw bridges repaired

as well as new roads, trash basins, and financial support building a public transport terminal, mosque, and a traditional marketplace

12. Producción y consumo responsables

Free training for locals

on composting and making organic fertiliser from invasive aquatic plants – providing free fertilisers to farmers to maintain healthy ecosystems

13. Acción por el clima

568,000 tonnes of CO2e

reduced on average annually, contributing to climate change mitigation

15. Vida de ecosistemas terrestres

20 hectares of land reforested

in the project area, as part of a dedicated programme to support a healthy, natural ecosystem

La solución

This grid-connected, run-of-river hydroelectricity plant is built on the upper banks of the Musi River near Sumatra’s port city of Bengkulu. By harnessing the kinetic energy of powerful running water, the Musi River Hydro plant has a total-installed capacity of 210 MW and delivers over 765,000 MWh to Sumatra’s grid every year – that’s enough to meet the demands of over 700,000 Indonesians on average each year!

project_image_300358-3.jpg
project_image_300358-4.jpg
project_image_300358-5.jpg
project_image_300358-3.jpg
project_image_300358-4.jpg
project_image_300358-5.jpg

El impacto

This project addresses issues in rural Sumatra such as poor electricity access and the lack of quality employment opportunities – as well as fostering sustainable economic development. The Musi River Hydro plant has created quality jobs and upskilling opportunities for locals in what has been traditionally a farming community. A portion of project revenue is reinvested in the local community, building an orphanage, constructing new roads, bridges, and a traditional marketplace – giving local farmers better access to their rice paddies and the opportunity to pursue additional income. A reforestation program has also been established in the surrounding catchment area to safeguard the natural landscape.

Project ID: 300358
Available Languages