Kontakta oss

Kina
project_image_302108.jpg

Plats
Kina
Typ
Waste-to-energy
Register
Standarder
vcs-standard-logo-with-title-south-pole.jpg

Globala målen för hållbar utveckling (SDG)

4. God utbildning för alla

Training for all employees

depending on their tasks they will be given general and technical training on installation, operation, maintenance and calibration of monitoring equipment

8. Anständiga arbetsvillkor arbete och ekonomisk tillväxt

New job opportunities

boosting economic development in the region

13. Bekämpa klimatförändringar

215,000 tonnes of CO2e

mitigated on average annually

Lösningen

The project involves capturing methane released at 4 coal mines near to Yibin city in southern Sichuan province. The captured methane is delivered to a newly constructed power plant with a combined capacity of 15 MW to convert it into power. This electricity will then be fed back to the coal mines for on-site electricity use, displacing electricity from the grid. In order to realise the project aim, other equipment and facilities such as gas storage tanks, compressors, and monitoring instruments will be installed as needed. Thanks to the project, an average annual volume of 15.6 million cubic meters of methane will be combusted and converted into electricity annually.

project_image_302108-3.jpg
project_image_302108-4.jpg
project_image_302108-5.jpg
project_image_302108-3.jpg
project_image_302108-4.jpg
project_image_302108-5.jpg

Verkan

The project helps to realise significant GHG reductions by capturing the methane that was previously released freely into the atmosphere. Furthermore, by providing jobs to locals, with each employee receiving thorough technical and general training for their role, local economic development is boosted. The project helps to set a precedent for other projects to be implemented in the region. Finally, boilers will be installed to recycle waste heat from the gas generators to provide the coal miners with hot water.

Project ID: 302108
Available Languages